|
New Baltimore Water Treatment Facility
METCO Services was responsible for providing Site Survey services utilizing High Definition Surveying (HDS) methods in order to map the existing conditions on the exterior of the Water Treatment Facility and to provide future 3D models of the existing structure.
- Provide horizontal and vertical control points (through conventional survey methods)
- Related all information to existing plant datum
- Locate utilities, above construction ground from field observations
- Include elevations on all lids, access manholes and structures on sedimentation basins and flocculation tanks.
- Detail valve locations and geometry
|
Click to see graphics:
Topographic Image
Photograph
 |